If you are taking a job in the LEAP Lebanon corridor, the five municipalities most people weigh are Lebanon, Whitestown, Zionsville, Westfield and Carmel, and the honest comparison between them is not about reputation. It is about which taxing district your parcel falls in, which school corporation levies against it, what kind of housing each place actually has standing today, and where new construction is being permitted right now. Those four things are all published by government agencies, they differ sharply between these towns, and in all three of the Boone County municipalities they differ sharply inside the same town.
We are writing this as a relocation decision page, not a promotional one. Every figure below comes from a state or federal primary source and carries its period. Where no figure exists, we say so instead of estimating one. That happens more often than you would expect, and the places where the data runs out are themselves useful: they tell you which questions have to be answered at the address level, with a licensed professional, rather than at the town level on a website.
What is actually committed at LEAP, and what is only proposed?
The Indiana Economic Development Corporation markets the district as the LEAP Lebanon Innovation District and describes “9,000+ acres ready to parcel for manufacturing or R&D facilities or corporate campuses,” positioned “just 30 miles from Indianapolis, Purdue University and Purdue’s Discovery Park.” The Indiana Department of Transportation, writing separately about a road project, calls it “the planned 9,000 acre LEAP Innovation and Research District.” The two state agencies do not use the same name, and IEDC’s own site carries this line: “Boundaries and proposed improvements shown on the site map are conceptual only, to be used for planning purposes, and are subject to change.” The City of Lebanon states that “the Limitless Exploration Advanced Pace (LEAP) project was launched by the IEDC.”
Separating what is committed from what is projected matters here more than anywhere else in Central Indiana, because most of what circulates online blurs the two.
| Status | What the primary source says |
|---|---|
| Built and operating | Lilly Lebanon Advanced Therapies opened May 6, 2026 as Lilly’s first dedicated genetic medicine manufacturing facility, the first of three planned sites on the Lebanon campus. |
| Under construction | Meta broke ground February 11, 2026 on “a state-of-the-art 1GW campus in Lebanon, Indiana,” an investment of more than $10 billion spanning roughly 4 million square feet, expected to support more than 4,000 construction jobs at peak and approximately 300 operational jobs. The City of Lebanon states Meta expects the first buildings to come online in late 2027. |
| Committed, future opening | Lilly announced an additional $4.5 billion across two of its three Lebanon sites on May 6, 2026, bringing its Indiana capital expansion commitments since 2020 to more than $21 billion. Chair and CEO David A. Ricks: “When our Lebanon API site opens in 2027, it will be the largest API production site in U.S. history.” |
| Projection, not a commitment | IEDC projects that “at full build, LEAP Lebanon will be home to hundreds of companies, employing over 50,000 employees.” This is a forecast at full build, not jobs committed or jobs created. |
| Solicitation only | The City of Lebanon states that proposals are being sought for LEAP’s mixed-use village. The solicitation was reported July 21, 2026 by Indiana business press. Acreage, budget and terms are not published. |
Sources: IEDC, LEAP Lebanon project page, retrieved August 16, 2026. Meta Newsroom and datacenters.atmeta.com, February 11, 2026. Eli Lilly and Company news release, May 6, 2026, full text hosted by the City of Lebanon. City of Lebanon LEAP page, retrieved August 16, 2026. INDOT, SR 32 New Alignment in Boone County project page, retrieved August 16, 2026.
No primary source publishes an acreage for Meta’s Lebanon campus. Meta publishes square footage, not acres. Earlier proposal-stage investment figures reported in 2025 were superseded by the February 2026 announcement. We do not repeat either, and you should treat any page that does as unsourced.
How are the five towns actually governed, and does it matter?
It matters more than most buyers expect, because governance determines who sets your zoning, who levies against your parcel and who you call when something goes wrong. Indiana Code 36-4-1-1 classifies municipalities by status and population: cities of 600,000 or more are first class, cities of 34,000 to 599,999 are second class, cities under 34,000 are third class, and “other municipalities of any population” are towns. A town stays a town regardless of size. Under IC 36-5-2-2, “the town council elected under IC 3-10-6 or IC 3-10-7 is the town legislative body. The president of the town council selected under section 7 of this chapter is the town executive.” In a city, by contrast, IC 36-4-4-2 provides that “the powers of a city are divided between the executive and legislative branches of its government.”
Zionsville is the exception that proves the rule. It is legally a town, listed by the Department of Local Government Finance as ZIONSVILLE CIVIL TOWN, and it is the largest of the five by land area, but it has a mayor. That is because Zionsville reorganized under Indiana’s Government Modernization Act at IC 36-1.5. The Town Council voted May 7, 2007 (Resolution No. 2007-06) to merge the then unincorporated portions of Eagle Township and Union Township with the Town, and voted again May 20, 2014 (Resolution No. 2014-11) to merge Perry Township, which created the office of Mayor and vested executive power in it. That history is why Zionsville covers 67.19 square miles with roughly a third of Carmel’s population, and why so much of what people call “Zionsville” is nothing like the Village.
| Municipality | Legal status (DLGF unit name) | Land area, sq mi | Pop., July 1 2025 est. | Change from 2020 base |
|---|---|---|---|---|
| Carmel | Carmel Civil City (a second class city) | 49.09 | 105,634 | +5.9% |
| Westfield | Westfield Civil City | 32.64 | 66,258 | +42.7% |
| Zionsville | Zionsville Civil Town (consolidated, has a mayor) | 67.19 | 33,624 | +10.1% |
| Lebanon | Lebanon Civil City | 17.31 | 17,913 | +6.9% |
| Whitestown | Whitestown Civil Town | 15.85 | 15,767 | +53.4% |
Sources: legal unit names from Indiana DLGF, 2026 Certified Tax Rates by Taxing District and Unit, certified January 15, 2026. Carmel’s second class designation from the City of Carmel, City Hall page, retrieved August 16, 2026. Land area from US Census Bureau, 2024 Gazetteer Files, Indiana places. Population from US Census Bureau, Vintage 2025 Subcounty Population Estimates, comparing the April 1, 2020 estimates base to the July 1, 2025 estimate. The estimates base is a modified base and is not identical to the published 2020 Census count.
Two things in that table drive relocation decisions. Whitestown and Westfield are growing at a rate the other three are not, which means more of what you can buy there is new and more of what surrounds you is unbuilt. And Zionsville’s land area, more than four times Whitestown’s and about 37 percent larger than Carmel’s, means “Zionsville” describes a very wide range of settings, from the brick street in the Village to farmland several miles out.
What will the property tax rate be, and why does it change within one town?
This is where the town name on your mailbox stops being useful. Indiana levies at the taxing district, not the municipality, and a single municipality can contain several districts at very different rates. The certified rates below are for the 2025 assessment year payable in 2026, certified by DLGF on January 15, 2026. They are gross rates per $100 of net assessed value, before any deductions, credits or the circuit breaker caps.
| Taxing district | County | 2026 rate | 2025 rate | School corporation levying in the district |
|---|---|---|---|---|
| Lebanon Corporation | Boone | 1.8864 | 2.0308 | Lebanon Community School Corp (0.8657) |
| Eagle/Zionsville Rural District | Boone | 1.8531 | 1.7871 | Zionsville Community Schools (1.3000) |
| Carmel | Hamilton | 2.0167 | 1.9977 | Carmel-Clay Schools (0.8425) |
| Zionsville Corporation | Boone | 2.0336 | 1.9795 | Zionsville Community Schools (1.3000) |
| Westfield | Hamilton | 2.3448 | 2.3247 | Westfield-Washington Schools (1.2883) |
| Whitestown Corporation | Boone | 2.4583 | 2.5956 | Lebanon Community School Corp (0.8657) |
Source: Indiana DLGF, 2026 Boone County and Hamilton County Budget Orders and the 2026 and 2025 Certified Tax Rates by Taxing District files. Rates are per $100 of net assessed value; the 2026 column is the 2025 assessment year payable in 2026, certified January 15, 2026. Rates for taxes payable in 2027 have not been certified.
Now the part that catches people. Each of those six lines is one district, and three of these municipalities contain several.
Inside the Town of Zionsville, the certified 2026 rate runs from 1.3663 in the Perry/Zionsville Rural District and 1.4220 in Worth/Zionsville Rural up to 2.0336 in Zionsville Corporation and the two urban service districts. That is a spread of 0.6673 within one town, wider than the 0.5719 that separates the five headline municipal districts in the table above. Inside Whitestown, the rate runs from 2.4026 in Perry/Whitestown Corporation to 2.8894 in Eagle/Whitestown Corporation, a spread of 0.4868, which is narrower than the between-town spread rather than wider. And Lebanon, which appears in the table as a single line, is five certified districts for 2026: Perry/Lebanon Corporation 1.7950, Worth/Lebanon Corporation 1.7982, Lebanon Corporation 1.8864, Washington/Lebanon Corporation 1.9209 and Jefferson/Lebanon Corporation 1.9221, a range of 1.7950 to 1.9221. In all three of these Boone County towns, the town name is not the unit of taxation.
The school corporation flips too. Parcels in the Perry/Zionsville and Worth/Zionsville rural districts pay the Zionsville Civil Town levy but are in Lebanon Community School Corporation, not Zionsville Community Schools. Parcels in Eagle/Whitestown Corporation are in Zionsville Community Schools while the rest of Whitestown is in Lebanon Community School Corporation. And a portion of Carmel sits in the Carmel Washington district (2.4068 for 2026), where the school levy is Westfield-Washington rather than Carmel-Clay.
One more comparison worth having, because it separates the municipal decision from the school decision. The municipal levy alone, per $100 of net assessed value for 2026, is 1.3439 for Whitestown Civil Town, 0.7783 for Carmel Civil City, 0.7363 for Lebanon Civil City, 0.7163 for Westfield Civil City, and 0.4881 for Zionsville Civil Town in the urban service districts (0.3076 in the rural districts). Whitestown carries by far the highest municipal levy of the five and Zionsville by far the lowest, which is the inverse of what most people assume from the headline district rates.
The above describes how Indiana’s certified rates are published. It is not tax or legal advice and it is not a calculation of anyone’s bill. A gross rate is only the starting point: homestead deductions, credits and the circuit breaker caps all change what is actually owed. Senate Enrolled Act 1 of 2025 phases the homestead standard deduction down by assessment date, from $48,000 for the 2025 assessment date to zero for the 2030 assessment date and each date after, while phasing the supplemental homestead deduction up by the year taxes are first due and payable, from 40 percent for 2026 to 66.7 percent for 2031 and each year after. The 2026 session left those two schedules unchanged. Separately, a new supplemental homestead credit equal to the lesser of 10 percent of the homestead’s property tax liability for the year or $300 first appears on bills payable in 2026. For your own parcel, contact the Boone County or Hamilton County Assessor, and consult a licensed Indiana tax professional or attorney before relying on any figure for a purchase decision.
Where is new construction actually happening?
Permit counts answer this without any interpretation. These are single family (one unit) permits authorized, as reported to the US Census Bureau’s Building Permits Survey by each jurisdiction. All places listed reported all months in the period with no imputation.
| Place | 1-unit permits, CY 2025 | 1-unit permits, Jan to Jun 2026 | Avg declared valuation per permit, CY 2025 |
|---|---|---|---|
| Westfield | 1,242 | 576 | $406,259 |
| Noblesville | 755 | 523 | $322,316 |
| Whitestown | 596 | 299 | $295,805 |
| Fishers | 459 | 113 | $370,484 |
| Carmel | 339 | 96 | $632,803 |
| Zionsville | 234 | 149 | $1,043,387 |
| Lebanon | 49 | 68 | $291,511 |
Source: US Census Bureau, Building Permits Survey, place-level files for calendar year 2025 and year to date through June 2026. Valuation is declared construction valuation at the time of permit and excludes land. It is not a sale price, a list price, or a price per square foot. Averages computed by The Steve Clark Team from the published 1-unit value and 1-unit units fields.
Three readings hold up. Westfield led Hamilton County with 1,242 one-unit permits in 2025 and led again with 576 in the first half of 2026, though Noblesville’s 523 narrowed the gap considerably; two published periods are not a trend and we will not extrapolate a half year into one. Whitestown is the volume leader in Boone County and is building at about 28 percent of Zionsville’s declared valuation per home, which is the clearest evidence available that the two Boone County towns are supplying different products. And Lebanon, the town the corridor is named after, authorized 49 single family permits in all of 2025 and then 68 in the first six months of 2026. That is the only place in the set where the first half of 2026 already exceeds the entire prior year.
What is already standing in each town?
New permits tell you what is coming. The existing stock tells you what you can actually shop for this month, which for most relocating buyers is the more urgent question.
| Place | Total housing units | Built 2010 or later | Single-family detached | In structures of 3+ units |
|---|---|---|---|---|
| Carmel | 40,859 | 22.8% | 69.9% | 23.7% |
| Westfield | 22,030 | 49.8% | 77.8% | 13.0% |
| Zionsville | 12,066 | 25.3% | 83.9% | 11.0% |
| Lebanon | 7,548 | 12.6% | 66.2% | 18.4% |
| Whitestown | 4,937 | 70.0% | 74.2% | 19.4% |
Source: US Census Bureau, American Community Survey 2020 to 2024 five-year estimates, Tables B25034 (year structure built) and B25024 (units in structure). Percentages computed from the published unit counts. Five-year estimates describe the survey period, not a single point in time.
Seven in ten homes in Whitestown were built in 2010 or later, and half of Westfield’s stock was. Only about one in eight homes in Lebanon was. If you want an established street with mature trees, Lebanon and Carmel have the deepest inventory of it and Whitestown has almost none. If you want a house that is under ten years old and you do not want to wait for a build, Whitestown and Westfield are where the supply is. Zionsville has the highest share of detached single family housing of the five, at 83.9 percent, and correspondingly the least attached and multifamily product.
What do the market numbers show, and what do they not show?
MIBOR REALTOR Association publishes its monthly Market Insights Report at exactly two geographies: the 17-county service area in aggregate, and each county individually. There is no MIBOR figure for Carmel, Zionsville, Westfield, Whitestown or Lebanon, and deriving one from a county number is fabrication. Any median price you see attributed to a specific town did not come from the association that runs the local MLS. We publish the county figures and we name the county.
| Single family | Hamilton County | Boone County |
|---|---|---|
| Median sales price, July 2026 | $489,990 | $418,000 |
| Median price change, July 2026 vs July 2025 | +1.39% | -9.03% |
| Closed sales, July 2026 | 601 | 137 |
| Closed sales change, July 2026 vs July 2025 | +4.34% | +19.13% |
| Median sales price, year to date through July 2026 | $490,000 | $410,000 |
| Median price change, year to date vs 2025 | +3.16% | -4.65% |
| Closed sales, year to date through July 2026 | 3,450 | 775 |
| Closed sales change, year to date vs 2025 | +5.34% | +20.16% |
| Active inventory, end of July 2026 | 916 | 213 |
| Months supply of inventory, end of July 2026 | 1.5 | 1.6 |
| Median days on market, July 2026 | 12 | 27 |
| Percent of list price received, July 2026 | 99.2% | 99.2% |
| Reported new construction sales price, July 2026 | $499,900 | $400,450 |
Source: MIBOR REALTOR Association, Market Insights Report July 2026, pages 14 and 17, data pulled 08/04/2026. Single Family Residence only; MIBOR publishes condominium data at the 17-county region level only. Monthly and year-to-date changes are shown separately and must not be mixed. Active inventory and months supply are point-in-time end-of-period readings. MIBOR restates prior-month figures in later editions.
The divergence is the story, and it holds on a single time basis. Comparing July 2026 with July 2025, Boone County closed 19.13 percent more single family sales while its median sale price came in 9.03 percent lower. Hamilton County over the same July-on-July pairing did the opposite: a smaller volume gain at 4.34 percent, and a median 1.39 percent higher. The year-to-date figures point the same way, again on their own basis: Boone closed sales up 20.16 percent through July with the year-to-date median down 4.65 percent. That pattern is consistent with Boone absorbing a large volume of new, lower-valuation construction, which the permit table above shows is exactly what Whitestown and now Lebanon are producing. It is not evidence that homes in Boone County lost value, and we will not present it that way. A shifting mix of what sells moves a median without moving any individual house.
How should I think about the commute if no drive times are published?
We do not publish drive times, because we have no authoritative source for them and inventing minutes is the easiest way to mislead someone who is about to sign a thirty-year note. What is published is the average commute residents of each place already have. The figures below are mean travel time to work for workers 16 and over who did not work at home, from the American Community Survey. They describe travel to wherever those residents currently work, which for most of the survey period was not LEAP.
| Place | Mean travel time to work | Workers in the base |
|---|---|---|
| Lebanon | 21.2 min | 7,927 |
| Zionsville | 22.7 min | 11,547 |
| Carmel | 24.6 min | 38,897 |
| Whitestown | 24.9 min | 5,892 |
| Westfield | 25.1 min | 22,963 |
Source: US Census Bureau, American Community Survey 2020 to 2024 five-year estimates, Tables B08013 and B08303. Mean travel time computed as aggregate travel time divided by workers 16 and over who did not work at home. This is not a drive time to the LEAP district.
On relative geography we have less to give you than you would like, and we would rather say so than fill the gap. The district is named the LEAP Lebanon Innovation District, IEDC states that the boundaries shown on its site map are conceptual only and subject to change, and we located no adopted boundary for it. Because the extent of the district is not published, we do not rank these five towns by proximity to it. What is fixed is county geography: Lebanon, Whitestown and Zionsville are all in Boone County along the I-65 spine, while Westfield and Carmel are in Hamilton County to the east, so a commute from either of those crosses county lines on an east-west route rather than running down the interstate. Drive the route you would actually drive, at the hour you would actually drive it, before you decide. That is the only commute figure worth trusting.
One INDOT project in the corridor is under construction and one is proposed, and they could change that geography in very different timeframes. The I-65 and US 52 interchange improvement, known as 52@65, Des. No. 2200176, is an INDOT project with FHWA involvement located near CR 300 outside Lebanon, built with state and federal funds, and it is under construction. We are not publishing an opening date for it. The project’s own published materials did not give us one consistent completion date and we did not confirm one with the agency, so ask INDOT’s Crawfordsville District rather than relying on a date from any website, including this one. Separately, the S.R. 32 New Alignment in Boone County is proposed, not scheduled. INDOT’s project page describes “proposed improvements” that “would realign and widen” the state road from County Road 500 West southeast just over four miles to west of Garrofolo Boulevard, widening to four lanes east of CR 250 West, with pedestrian facilities anticipated. INDOT publishes no construction timeline, no funding status and no letting date for it.
What else should influence the choice?
Utility capacity is being built out on a published schedule
Lebanon Utilities publishes the phasing of its wholesale water supply program as Phase 1 in 2027 at up to 2 million gallons per day, Phase 2 in 2028 at up to 10 MGD, and Phase 3 in 2031 at up to 25 MGD. Phase 1 construction includes a 2-million-gallon ground storage tank, a pressure booster station, 48,500 feet of large-diameter transmission lines and a 2-million-gallon elevated storage tank south of SR 32. Lebanon Utilities states that “current LU customer rates will not increase due to this project” and that “loan repayment will come from sewer rates within the LEAP Innovation District, not existing customers.” What that schedule means for residential water and sewer capacity is not something Lebanon Utilities publishes, and we are not going to infer it from a wholesale supply and financing document. If you are buying in Lebanon, put the question to Lebanon Utilities directly: what capacity is allocated to residential connections, and on what schedule.
County land-use rules are not the same as town land-use rules
On June 15, 2026 the Boone County Board of Commissioners unanimously approved a one-year moratorium on new data center development in unincorporated Boone County, effective June 16, 2026 through June 15, 2027. It applies only to new data center facilities in unincorporated Boone County and, in the county’s words, “does not affect existing facilities or other types of development.” The county noted that its Comprehensive Plan was adopted in 2009 and its Zoning Ordinance in 1998. We are not going to characterize what that does or does not mean for any specific project. The relocation point is narrower and solid: if you buy on unincorporated county land rather than inside a town or city, a different body writes the rules for what can be built next to you, and in Boone County those rules are currently under review.
School corporations, stated plainly
Which corporation serves your address is determined by the taxing district, as shown above, not by the town name. Official enrollment for the 2025-26 school year, as reported by the Indiana Department of Education, is 15,913 in Carmel Clay Schools, 10,396 in Westfield-Washington Schools, 8,003 in Zionsville Community Schools and 3,754 in Lebanon Community School Corporation, each serving prekindergarten through grade 12. We name districts, grade ranges and official enrollment and nothing further. Verify the assigned school for a specific parcel with the corporation itself before you write an offer.
1. Get the taxing district for the specific parcel from the county assessor, not the town name. 2. Confirm the school corporation for that district and then the assigned school with the corporation. 3. Ask a licensed Indiana tax professional what your bill looks like after deductions, credits and the caps, since Senate Enrolled Act 1 of 2025 is still phasing the two homestead deductions in opposite directions on two different clocks and a new supplemental homestead credit first appears on bills payable in 2026. 4. Drive your real route at your real hour. 5. Check whether the parcel is inside town limits or in unincorporated county, because that decides who writes the zoning next door.
Frequently Asked Questions
Which town is closest to the LEAP district?
We will not rank them, because the district’s extent is not published. IEDC states that the boundaries shown on its site map are “conceptual only, to be used for planning purposes, and are subject to change,” and we located no adopted boundary for the LEAP Lebanon Innovation District. What is fixed is county geography: Lebanon, Whitestown and Zionsville are all in Boone County along the I-65 spine, and Westfield and Carmel are in Hamilton County to the east. We also do not publish drive times, because no mapping or INDOT source publishes them for these pairs and estimating them is not something a broker should do.
What is the median home price in Zionsville, Westfield or Whitestown?
No such figure is published. MIBOR REALTOR Association, which operates the local listing cooperative, publishes market statistics only for its 17-county service area in aggregate and for each county individually. There is no MIBOR number for any town in this comparison. The county figures for July 2026 are single family medians of $489,990 in Hamilton County and $418,000 in Boone County.
Which of these towns has the lowest property tax rate?
The question does not have a town-level answer, because Indiana levies at the taxing district. Among the five headline municipal districts shown in the table above, Lebanon Corporation carries the lowest certified 2026 gross rate at 1.8864 per $100 of net assessed value and Whitestown Corporation the highest at 2.4583, a spread of 0.5719. But Lebanon itself contains five certified districts and the lowest of them is Perry/Lebanon Corporation at 1.7950, not Lebanon Corporation. Only Zionsville’s internal range exceeds the between-town spread: its districts run 1.3663 to 2.0336, a spread of 0.6673. Whitestown’s run 2.4026 to 2.8894, a spread of 0.4868, which is narrower. Rates for taxes payable in 2027 have not been certified. These are gross rates before deductions, credits and the caps, and your actual bill requires professional advice on your own parcel.
Why is Zionsville a town if it is bigger than Lebanon, which is a city?
Indiana Code 36-4-1-1 classifies cities by population but classifies “other municipalities of any population” as towns, so size does not force a change. Zionsville consolidated with Eagle, Union and Perry townships under the Government Modernization Act at IC 36-1.5, by council resolutions in 2007 and 2014, and the 2014 reorganization created the office of Mayor. That is why Zionsville covers 67.19 square miles, larger than Carmel’s 49.09, while remaining a civil town.
Where can I actually buy a house that is less than ten years old?
Whitestown and Westfield have the newest stock by a wide margin. Per the American Community Survey 2020-2024 five-year estimates, 70.0 percent of Whitestown’s housing units and 49.8 percent of Westfield’s were built in 2010 or later, against 25.3 percent in Zionsville, 22.8 percent in Carmel and 12.6 percent in Lebanon. Westfield also led all seven area municipalities in single family permits in 2025 with 1,242, and led again in the first half of 2026 with 576, with Noblesville close behind at 523.
How many jobs is LEAP actually bringing?
IEDC projects that “at full build, LEAP Lebanon will be home to hundreds of companies, employing over 50,000 employees.” That is a projection at full build, not a count of jobs committed or created, and no date is attached to it. What is documented from company sources is narrower: Meta states its Lebanon campus is expected to support more than 4,000 construction jobs at peak and approximately 300 operational jobs, and Lilly has opened one of three planned Lebanon sites with its API site scheduled to open in 2027.
Does the Boone County data center moratorium affect the Meta project?
We are not going to characterize that. What the county published is that the ordinance, approved unanimously on June 15, 2026 and effective June 16, 2026 through June 15, 2027, applies only to new data center facilities in unincorporated Boone County and “does not affect existing facilities or other types of development.” Whether any particular parcel is inside a municipal boundary or unincorporated is a parcel-level question for the county.
Is new construction more expensive than resale in these counties?
It depends on the county, and the comparison is imperfect. For July 2026 MIBOR reported a new construction sales price of $499,900 in Hamilton County against an overall county single family median of $489,990, and $400,450 in Boone County against a county median of $418,000. So new construction sat slightly above the county median in Hamilton and slightly below it in Boone. MIBOR labels that row “New Construction Sales Price” and does not label it a median, so we do not either.
My builder says the home comes with a ten-year warranty. Is that Indiana law?
Indiana’s new home construction warranty statute at IC 32-27-2 is permissive, not mandatory. IC 32-27-2-8(a) says the builder “may warrant” the statutory periods, so the operative question is whether the warranty appears in your written contract. Read the contract, and if the answer matters to your decision, have an Indiana attorney read it with you before you sign.
Related reading
- Carmel vs Zionsville: How the Two Communities Actually Differ
- The LEAP Lebanon Innovation District, Explained
- What Indiana Senate Bill 1 Changed About Your Property Tax Bill
- Hamilton and Boone County Market Update
- Buying New Construction in Indiana: What to Verify Before You Sign
- Carmel · Zionsville · Westfield · Fishers · Noblesville · Whitestown
Relocating for a role in the corridor?
We will pull the taxing district, school corporation and permit history for any specific address you are considering, before you tour it. No pressure, no drip campaign.
Talk to The Steve Clark Team